OCEAN CONDITIONER - This original SeaVax vessel was designed to operate in fleets to target ocean waste before it settles on the ocean floor where nobody can recover it. There is nothing like it in existence today, though other ideas for trapping plastic waste are being developed, such as that of Boyan Slat and the Seabin. SeaVax was to be made more cost effective in operational terms with AmphiMax versatility that slashes the cost of production and servicing by using a amphibious portable dock for assembly, launch and servicing. SeaVax would have been the only ocean going machine capable of harvesting ghost fishing nets. Eleven years on from 2015, in 2026 there is still nothing that can do that.

 

 

 

 

 

WHAT IS COASTAL VAX?

 

Okay, so you have what you think is a terrific idea. But will it work? And where is the money coming from to test the theory?

 

Funding is one of the biggest hurdles to overcome, with any project. No dough, no go!

 

We have tried a 2.2 meter (proof of concept) model in our test tank. We know the idea works in controlled conditions, and we know that a pioneering, solar powered lobster fishing boat named Lorna Jane, is operating in Scottish waters. Is fishing for plastic litter so very much different?

 

There are few funding mechanisms: Crowd Funding; Lottery Funding; Innovate UK, and EU Horizon Funding. We have tried for Horizon funding three times with no luck, and twice for Innovate funding. So maybe not the best use of our energies trying those again. 

 

We may be wrong, but have you seen the forms to fill in? The negotiations with potential consortium partners? Granted, we will have to negotiate prices for components and materials with commercial suppliers, that being far more of a certainty, with almost no wasted effort in our past endeavors. We find the best deals, and the goods arrive. No form filling, draining the life from productivity.

 

Crowd funding has worked in-part, and we are very grateful for that leg up, save that the conditions can be somewhat onerous time wise; somewhat forcing the pace as a condition that worked against us, trying to beat the clock. Lottery funding is well worth a look at. But, before we even begin to consider any of those, we are going to run through some cost scenarios. 

 

Bear in mind that a 10-14 meter coastal vax, or CoastVax, is not capable of hauling or shredding ghost fishing nets. That function is reserved for the thrice enlarged SeaVax; where size matters.

 

We now have a patent in play, that may help us in the longer term, establishing us as the world experts in intelligent mass seawater filtration in theory, (assuming grant). Though, not giving us any real world experience against wind and waves. The PlanetSolar Turanor, the first solar powered ship to cruise the oceans, being the benchmark at present.

 

So how much will a 10-14 meter basic version of our idea cost to build?

 

 

 

Prototype solar and wind powered ocean and river plastic sampling machine

 

TOO BIG: RIVERVAX PILOT - This prototype vessel could have leapt ahead of other designs to become a reality in 2022 with appropriate levels of support for the development consortium from the European Commission. We are now thinking smaller and cheaper. To be able to experiment with harvesting gear with a rig of some kind. No wind turbines cuts the costs right away. And, using green hydrogen derived fuels in coastal situations, is an option. The Lorna Jane charges in dock.

 

 

 

 

We are looking to construct a simple rig version of the SeaVax concept, a coastal vessel smaller and more basic than Rivervax. We would like to size the vessel around 24 solar panels to generate 10.8 kilowatts of electricity. The vessel will be something like 14 meters in length and a trimaran in effect, with two sponsons made from steel oil drums (as the opening gambit), and a larger central collector or mouth that lowers into the sea when deployed, that is not hydrodynamic at all, because the mouth filters plastic from seawater.

 

We need to generate ballpark estimates of speed through the water, using a battery to store energy for low power overnight operations, if required. Estimating the displacement if the remainder of the hull (box section spaceframe) is aluminum, and the solar panels weigh 432 kilograms and the batteries 430kg. This is our design brief, one foot on the starting grid.

 

 

1. Estimated Displacement Breakdown

With an aluminum box-section spaceframe, 24 solar panels, battery bank, and oil-drum sponsons, the total lightship and operational displacement is estimated at 2.8 to 3.5 metric tonnes (2,800 – 3,500 kg).

Component / Subsystem Estimated Mass Notes & Assumptions

• Solar PV Array =432 kg Given (24 panels @ 18 kg each, 10.8 kW peak)

• Battery Storage Bank = 430 kg Given (approx. 40–60 kWh usable depending on chemistry)

• Aluminum Spaceframe = 750 kg (14m x 3–4m beam aluminum truss/box-section frame)

• Sponsons (Oil Drums) 500 kg ~32 x 205L steel oil drums (~15 kg each + joining structure)

 

• Central Hull, Filter & Drives = 650 kg

• Scoop/mouth frame, conveyor belts, water pumps, electric thrusters

• Lightship Weight (Dry) ~2,762 kg

• Base hull and mechanical systems

• Payload & Operations Margin+500 kg

• Collected plastic payload, liquid ballast, safety gear

Total Operational Displacement ~3,262 kg (~3.3 tonnes Fully loaded operating condition)

 

 

 

Coastal and river skimmer workboat solar powered

 

 

 

COASTAL CLEANER SIDE VIEW V1 - This is a draft design for a coastal/river experimental rig based on the SeaVax concept from March 2019. Unlike SeaVax, this low budget development boat was to be built of steel, not aluminium, to keep the up front costs down, though long-term use would favour aluminium alloys. As to economics, who might pay for the operations of such a vessel locally remains to be answered. Unlike a dustcart that collects household waste, there is no immediately obvious health hazard from not cleaning or monitoring the oceans, rather it is out of sight, toxic, cumulative and just as deadly. We are no longer promoting wind power, the state having shown no interest in that method of propulsion. It will need someone with deeper pockets and more influence, to carry that particular torch. The good news being, that the craft is far less complicated design wise.

 

 


Sponson Buoyancy Check:

A 14-meter length fits approximately 16 standard 205-litre (55-gallon) drums per side (32 drums total).

Total Sponson Displacement Capacity: 32 x 205L = 6,560 Litres (~6.56 tonnes of buoyancy).

This provides a 2:1 buoyancy reserve ratio on the sponsons alone, ensuring high lateral stability even before accounting for the displacement of the main central hull.


2. Speed & Power Estimates Through the Water

Because the central hull features an open intake mouth and the oil-drum sponsons create surface ridge turbulence, the vessel will experience higher form drag than a standard sleek catamaran or trimaran.

Assuming an overall propulsive efficiency of 55% (typical for low-speed electric marine pods/thrusters):


Drag & Required Power Profile

Speed (knots) | Total Drag (N) | Propulsion Power
-----------------------------------------------------------
2.0 knots        |    283 N          |    0.5 kW
3.0 knots        |    636 N          |    1.8 kW
4.0 knots        |    1,130 N       |    4.2 kW
5.0 knots        |    1,770 N       |    8.3 kW
5.5 knots        |    2,150 N       |    11.1 kW



SPEED REGIMES

Overnight Low-Speed Operation (1.0 to 1.8 kW Power Draw):

Speed: 2.5 to 3.0 knots (approx. 4.6 – 5.5 km/h).

Endurance: Drawing 1.5 kW overnight (e.g., 8 hours) consumes 12 kWh of energy, which is well within the capacity of a typical 430 kg lithium battery bank (~50–60 kWh capacity).

Daytime Operational Filtering Mode (5.0 kW to Thrusters, 5.8 kW to Filtration/Pumps/Auxiliaries):

Speed: 4.0 to 4.3 knots (approx. 7.4 – 8.0 km/h).

This is the optimal speed for skimming river/estuary trash without pushing excessive bow-wave water over the intake conveyor.

Maximum Speed (Full 10.8 kW Solar Direct to Propulsion):  ~5.5 knots (approx. 10.2 km/h).

Beyond 5.5 knots, wave-making resistance from the blunt central intake and ribbed drum sponsons increases rapidly.


Key Design Considerations

Sponson Fairing: Adding simple conical nose cones and smooth PVC/canvas fairings or wraps over the oil drum ridges will reduce hull skin friction by 20–30%, adding roughly 0.5 to 0.8 knots to our top speed at the same power input.

Intake Flow Control: Providing an adjustable baffle or hinged flap at the central intake mouth will allow you to close or stream the intake when transiting between collection sites, significantly lowering drag during transit.

 

 

The oil drum proposal is and was a suggested starting point to reduce the build cost. If those sponsons are replaced with alloy cylinders and smooth welds, with a conical nose and taper tail, hull drag will reduce significantly. Leaving us to work on cost reduction relating to fabrication.

 

We are thinking to (maybe) build this craft in-house, using our own welding equipment, from 5083 alloy. If the hull is around 3.3 tonnes, we think the cost of the aluminum will be containable, along with the solar panels and lithium battery, and thrusters. What then is a ballpark figure for the cost of the components and materials, based on average prices from suppliers to the UK market?

 

Replacing the oil drum sponsons with smooth, tapered 5083 aluminium cylinders (with conical noses and hydrodynamically tapered tails) will yield a 25% to 35% reduction in overall hull drag. At equivalent power levels, this will increase our cruising speed by roughly 0.7 to 1.2 knots and substantially improve fuel/power efficiency.

Because we would be building and welding in-house, in this example, we'd eliminate commercial shipyard labour rates (£60–£90/hr), bringing total expenditure down strictly to raw materials, equipment, and key propulsion hardware.

The table below outlines ballpark component and materials budget based on direct UK trade and commercial supplier prices.

 

 

Estimated In-House Build & Hardware Budget (UK Market Prices)

All figures are estimates ex-VAT unless noted, assuming trade/commercial purchasing in the UK.



Procurement & Fabrication Highlights

1. Aluminium Sheet (5083-O / H111):


When purchasing 5083 marine-grade sheet, buying in standard $2,500\text{mm} \times 1,250\text{mm}$ or $3,000\text{mm} \times 1,500\text{mm}$ full mill sheets directly from major UK stockists (such as Aluminium Warehouse, Righton Blackburns, or Aalco) drops the cost per kilo down towards the lower end of the £4.00/kg range.

2. Rolling the Cylinders:

Forming smooth cylinders out of 3mm or 4mm 5083 sheet in-house requires access to a 2m or 3m three-roll initial pinch plate roll. If rolling in-house is not feasible, ordering pre-rolled tube sections or having a local steel fabricator roll the skin sheets usually adds only a modest sub-contract fee (£400–£800 total).

3. Solar Panel Sourcing:


Tier-1 solar panels (like JA Solar or LONGi N-type bifacial panels) sit at historically low commercial price levels in the UK (£0.13 to £0.16 per watt ex-VAT). Buying a full pallet of 24 to 30 panels gets wholesale pricing.

4. LiFePO4 Cells vs. Modular Packs:

Building your own 48V pack using raw 3.2V 280Ah/314Ah Prismatic LiFePO4 cells with a quality smart BMS reduces battery costs to around £70–£90 per kWh, whereas pre-packaged drop-in marine modules sit nearer to £110–£140 per kWh.


 

 

 

 

Filtration head water treatment Design Copyright 2019

 

 

DESIGN DRAFT - The filtration module, cargo hold and offloading mechanism is shown in red in outline form in the above diagram. The system consists of several integrated components, incorporating motors, pumps, hydraulics, electronics and computer programs - all to be powered by energy from nature - to avoid creating greenhouse gas emissions. You can see from the level of integration that such a system would not lend itself to a bolt-on item for existing vessels. The vessel has to be custom designed and built.

 

 

 

 

         

 

 

 

DRAFT COASTAL DESIGN - These diagrams show a single 1.5kW wind turbine mast, an experiment that was planned for 2020 funding dependent - that never materialised. This version uses 36 solar panels to give 6.9kW (9.25hp) per hour energy harvesting in sunlight. It is worth noting that a small craft like this offers only one eighth the efficiency of the full size SeaVax machines.

 

 

 

 

 


REVISED PROJECT BUDGET (SELF BUILD) INCLUDING 1/4 SCALE AMPHIMAX

 

1. CoastVax Craft 14m 5083 Aluminium Hull & Hardware

• 5083 plate & 6082 extrusions for central hull & tapered cylinder sponsons
• 10.8 kW solar PV array + 40 kWh LiFePO4 battery bank + MPPT controllers
• Dual 6kW electric pod thrusters + controls & wiring
• Plastic intake conveyor & mechanics

£23,500

2. 1/4-Scale AmphiMax Steel Spaceframe Launch / Recovery Vehicle

• Structural steel box section & heavy plate frame
• 4x rubber-tracked caterpillar bogie assemblies (mini-excavator style undercarriage units)
• Flowfit hydraulics: 2x track motors, proportional directional control valves

• Hydraulic pump, reservoir, high-pressure hoses & fittings
• Reconditioned second-hand diesel engine (power pack drive)
• Hydraulic recovery winch & tilt mechanism

£11,200

3. Mobile Site Support Onsite Power & Transport

• LWB Ford Transit Support Van: Used (Euro 6, strong chassis/runner for equipment hauling)
• Mobile Welding Generator Rig: 15–20 kVA diesel generator 

  (provides clean 3-phase/single-phase power for pulse-MIG/TIG aluminium welding on location)

£12,000

4. Permits & Admin Crowdfunding & Operational Overheads (~12%)

• Platform fees (Kickstarter/Indiegogo + processing)
• Eastbourne beach access, EA/local authority launch permits & insurance

£5,600

Subtotal Direct Hardware, Equipment & Operations Base

£52,3005. 

Contingency Buffer40% Unforeseen Costs Buffer

• Covers material price fluctuations, steel/aluminium scrap allowance, hydraulic tweaks, and site logistics contingency

£20,900

TOTAL CAMPAIGN TARGET Complete Mobile Build, Launch System & RiverVax Vessel (self-build)

 

£73,200

 

 

Key Technical & Fabrication Notes

1. AmphiMax Hydraulic Drive Circuit:


• Powering the 1/4-scale AmphiMax track bogies via Flowfit hydraulics is straightforward using an engine-driven tandem gear pump (or variable displacement piston pump).

• Utilizing dual orbit hydraulic motors with integrated overcenter brake valves on each track pair gives independent skid-steering, enabling the vehicle to pivot directly on shingle beaches at Eastbourne.

2. Onsite Aluminium Welding Rig:

• Aluminium MIG welding (especially 5083 plate outdoors) requires clean voltage stability and high amperage. A 15–20 kVA towable diesel generator ensures high duty cycles for high-amperage MIG spool-gun welding without tripping thermal cuts. A portable wind-break shelter on the beach will also be necessary to preserve Argon gas coverage while welding outdoors.

3. Asset Value Post-Launch:

• The LWB Transit van, welding generator, and 1/4-scale AmphiMax launch rig retain their utility beyond the initial RiverVax assembly. They form a permanent, mobile launch-and-recovery kit for future vessels or maintenance ops.

 

 

The last thing we need is crane hire. To be able to lift the component hull parts, onto and into position on the baby Amphimax. We will also need water filtration equipment as part of the RiverVax, and navigation equipment, sonar, radar and autopilot. This will not give us an AI SeaVax type vessel, but a prototype to test out the concept, for when calls come up that may allow us to attract partners for Horizon Europe, and Mission Ocean & Waters, EU calls. We will not have the resources to lead any Horizon bid. We might only support another lead bidder. One call where we were the lead, cost us something like £20,000 pounds, that we did not have to burn.

Positioning the CoastVax as an operational hardware demonstrator creates the perfect tangible baseline for Horizon Europe work packages (such as Horizon Europe Cluster 6: Circular Economy and Bioeconomy or Mission Ocean & Waters).

CRANE HIRE & NAVIGATION INSTRUMENTS

 

Adding a mobile crane hire block for beach assembly, a commercial navigation & auto-steering suite (radar/sonar/autopilot), and our £15,000 experimental filtration R&D budget reshapes the project into a fully instrumented research testbed.

Below is the adjusted budget with these additions and the updated 40% contingency buffer.


Updated Master Project Budget & Horizon Europe Prototype Target
All prices estimated UK commercial/trade figures ex-VAT.

 

 

Category Component / Hardware Breakdown Estimated Cost

1. RiverVax Hull & Drive


14m 5083 Aluminium Hull & Solar Power System

• 5083 plate & 6082 extrusions for central hull & tapered cylinder sponsons
• 10.8 kW solar PV array + 40 kWh LiFePO4 battery bank + MPPT controllers
• Dual 6kW electric pod thrusters + controls & wiring

£22,000

2. Filtration R&D Suite

Experimental Water & Plastic Filtration Mechanics

• Dedicated water filtration, microplastic skimmers, intake conveyor mechanics, macerator/shredder pumps, and test sampling sensors

£15,000

3. Navigation Electronics Integrated Bridge & Sensor Suite

• 10"/12" MFD Chartplotter (Garmin/Raymarine)
• Compact Radome Marine Radar (closed dome for target/obstacle tracking)
• CHIRP SideVό & DownVό Sonar (bathymetry & subsurface debris scan)
• Hydraulic Autopilot Corepack & Heading Sensor (course keeping)

£4,500

4. 1/4-Scale AmphiMax Steel Spaceframe Launch / Recovery Vehicle
• Structural steel box frame + 4x tracked caterpillar bogies
• Flowfit hydraulics: track motors, proportional valves, pump, tank, hoses
• Donor diesel engine power pack + hydraulic recovery winch

£11,200

5. Support & Assembly Mobile Transport & Beach Assembly Infrastructure
• LWB Ford Transit Support Van (used Euro 6 runner)
• 15–20 kVA mobile diesel welding generator rig
• Contract Mobile Crane Hire: (~3–4 days site visits for placing central hull and heavy sponson modules onto AmphiMax at Eastbourne beach)

£14,500

6. Overheads & Permits Crowdfunding & Operational Admin (~12%)

• Platform fees (Kickstarter/Indiegogo + Stripe processing)
• Eastbourne beach access, Environment Agency/Port Authority launch permits, site insurance

£8,000

Subtotal Direct Prototype Hardware, Electronics & Operations

£75,200

7. Contingency Buffer 40% Unforeseen Costs Buffer

• Covers material price swings, custom hydraulic fittings, extra crane time, and prototype adjustments

£30,080


TOTAL CAMPAIGN TARGET

Complete Mobile Build, Research Testbed & Launch System = £105,280


EU Water Mission Call / Horizon Europe Positioning Advantages

• TRL 5/6 Readiness: Having an actual 14m vessel with real-time sonar/radar logging and a dedicated £15,000 filtration test setup would shift our rating from a concept (TRL 3) to a validated prototype in a relevant environment (TRL 5–6).

• Data-Gathering Platform: The radar and side-scan sonar suite won't just keep the craft safe; it can log floating debris fields and seabed profiles, generating the empirical datasets required for EU research partners.

• Modularity: Designing the £15,000 filtration rig as a modular payload bay allows future Horizon partners to slot in their own microplastic filters, sensor arrays, or bio-reactors without altering the core vessel drive or AmphiMax launch rig.

 

 

 

VOLUNTEER AGE CONTINGENCY

 

As a not-for-profit organization, the Cleaner Ocean Foundation has another potential problem. One of our key volunteers in over 70 years old. He is still keen, but he is the only person qualified and skilled enough to weld alloy, design and fit drive machinery, etc. Raising the money for such projects is not plain sailing at the best of times. We think it wise to have a skilled labour quotient, just in case of illness, or infirmity. We would like to build in professional hull fabrication costs at a shipyard, and professional boat fitting-out services, all at reasonable industry rates. A good cost comparison exercise in any event.

Transitioning from an in-house volunteer effort to commercial marine shipyard contracting provides vital risk mitigation. In the UK, commercial boatbuilding yards and specialist marine fabricators typically charge trade labour rates between £55 and £75 per hour (ex-VAT) for coded aluminium TIG/MIG welders, marine electricians, and shipwrights.

Building in professional labour ensures the project remains fully viable regardless of individual volunteer availability. It also satisfies institutional funders, grant bodies, and UKCA/RCD surveyors who often require certified coded welders for structural hull compliance.

Below is the comparative breakdown integrating professional commercial yard fabrication and system fit-out services.

 


Professional Yard Build vs. Self-Build Cost Comparison
All commercial estimates are based on UK marine industry benchmarks (£62.50/hr average yard rate).

 

.....

 

 

 

 

 


Key Takeaways for Grant Applications & Crowdfunding

1. Dual-Tier Funding Strategy:

Tier A (£105,000 Target): Framed as a Community & Volunteer Tech Demonstrator built in-house with volunteer expertise, using the mobile support rig and Eastbourne beach launch site.

Tier B (£260,000 Target / Horizon Europe Match-Funding): Framed as a Fully Commercial Prototype Build outsourced to a certified UK boatyard (such as facilities along the South Coast in Solent, Poole, or Shoreham).

2. Compliance & Surveyor Advantages:

Having a commercial yard handle the 5083 aluminium welding automatically generates coded welder certificates (BS EN ISO 9606-2) and material traceability logs (EN 10204 3.1). This speeds up MCA Workboat Code or RCD Category C certification, which is particularly beneficial when presenting the craft for Horizon Europe consortium calls.

3. Hybrid Operational Model:

You can also present a hybrid approach: contract out only the critical structural aluminium hull welding to a specialist fabrication shop (~£65k) while keeping the machinery fit-out, solar mounting, and filtration gear in-house (~£0 labour), bringing the pre-contingency budget to around £140,000.

 

 

 

 

 

 

 


If we are going for MCA workboat certification. We may want to include professional naval architect design fees.

Engaging a registered Naval Architect is important for obtaining MCA Workboat Code (Workboat Code Edition 3 / MGN 280) approval, particularly for an unusual non-standard geometry like a 14-meter trimaran with an open-mouth intake hull.

A Naval Architect provides the validated engineering package that Certifying Authorities (such as MECAL, YDSA, or IIMS) require before issuing a Workboat Certificate.

Scope of Professional Naval Architecture Services


For a novel vessel like CoastVax, naval architecture fees cover:

1. Lines Drawing & 3D CAD Hydrodynamics: Hull lines, hydrostatic modeling, wetted surface area, and CFD drag verification for the central open-mouth hull and tapered sponsons.

2. Structural Fire & Strength Calculations: Structural scantling calculations to ISO 12215 / Workboat Code Edition 3 standards for 5083-H111 aluminium plate and 6082-T6 extrusions.

3. Stability Information Book (SIB): Inclining experiment supervision, intact stability curves, and damage stability modeling (crucial for trimarans with open intake bays).

4. General Arrangement (GA) & Safety Plan: Electrical schematic review for high-voltage DC (lithium/solar bus) and machinery integration.

Estimated Naval Architecture & Coding Fees (UK Market)

 

 



 

Concept & Lines Modeling

3D hull geometry, hydrostatics, displacement & center of gravity (CG) baseline 

 

£3,500 – £5,000

 

Structural Scantling Review

 

ISO 12215 structural calculations & plate/framing thickness verification

£2,500 – £4,000

Stability Booklet (SIB)

 

Intact and damaged stability modeling + inclining test sign-off

£3,000 – £4,500

Certifying Authority Fees

MCA Certifying Authority (MECAL/YDSA) coding survey, plan approvals & SIB endorsement

£1,500 – £2,500

Total Professional Design & Coding

Complete Naval Architecture & MCA Compliance Package

£10,500 – £16,000

Updated Master Budget Comparison (Including Naval Architect)

 

Adding a median £13,000 Naval Architecture & Survey Fee updates the total campaign targets across both models:

 

....

 

 

 

 

 

 


....

 

 

 

 

 

 


....

 

 

 

 

 

 

 


.....

 

 

 

 

 

 

 

TESTING - Chris Close (Project Director 2015-2017) is seen here watching the SeaVax proof of concept boat filter plastic particles from water in our test tank facilities, in this case small polystyrene pieces were scattered on the surface and recovered using twin hydrocyclonic chambers to trap the plastic, while clean water was returned to the tank. Simple, and it worked. We designed and built the craft in house.

 

 

 

 

 

THE UNITED NATIONS UNEP - Could SeaVax be a part solution for UN goals?

CAPEX AND OPEX - What level of G20 investment is required?

GHOST FISHING GEAR - Drowning fish, mammals and reptiles, and animal poisoning

HEALTHIER OCEANS & BLUE GROWTH - What are the health benefits?

INVESTABILITY - Can SeaVax 2.0 AI be a commercial success?

WHERE DOES AI COME IN? - Will artificial intelligence make a difference?

WHAT IS THE MARKET VALUE OF OCEAN PLASTIC? - Is it worth fishing for marine plastic? 

CERTIFICATION - How will the ocean plastic be verified for credits?

WORLD BANK, IMF & UNEP - Are there any match funding opportunities?

CIRCULAR (PLASTIC) ECONOMY - FISHING GROUNDS

PATENT APPLICATION - GB2622325.5 23rd September 2026

PATENT ABSTRACT - DESCRIPTION - CLAIMS - ACCELERATION

SARGASSUM CHAIN - The 5,500 mile bloom, 33 million ton Atlantic belt?

SARGASSUM $VALUE - Where is the dollar value in recovered treated brown sea weed?

THE CARIBBEAN - Gulf of Mexico, Cancϊn, Tulum - Barbados, Saint Lucia, Martinique, Guadeloupe, 

                              Dominican Republic & Puerto Rico

 

 

COASTVAX (CVAX) - Ballpark budget 10-14 meter coastal prototype - self build concept

CVAX SHIPYARD - Commercial construction estimates 5083 and 6082 alloys

CVAX SOLAR POWER - Wing panels stressing and hydraulic gearbox calculations for 30 knot winds

CVAX UK - Blue channels for coastal operations: Bristol, Lyme Bay, Celtic Sea, Dover Straits, Irish Sea

CVAX MEDITERRANEAN - Blue channels (Libya, Egypt, Cyprus, Aegian, Adriatic, Alboran, Balearic, seas

CVAX GULF OF MEXICO - Yucatan Channel, Campeche Bay, Florida Straits, Texas Islands

CVAX CARIBBEAN - Colombia, Costa Rica, Belize, Haiti, Honduras, Jamaica, Nicaragua, Panama, Venezuela

 

 

 

 

The SeaVax proof of concept boat during open water trials

 

 

OPEN WATER - SeaVax is seen here during open water floatation trials. Please note that this is a small (proof of concept) version of any ocean or river floating dustcart that we hope will be tested on the south coast of England as the project progresses. SeaVax is a selective filtration machine that can be configured to target solid plastics and particles. The machine could also be used in oil spill emergencies, or as a selective fishing vessel. The platform could thus be useful in many ways.

 

 

 

 

 

 

 

 

 

 

 

There are 5 swirling ocean garbage patches, filled with marine litter/plastic, called gyres. That said, we will not be looking any further than UK and Mediterranean littoral coastlines and rivers with any CoastVax test rig - if we get that far. As we say, the idea is the easy part. Funding, is another matter. That is in the hands of the gods and the will of the people.

 

 

LINKS & REFERENCE

 

https://www.

 

 

 

Humpback wales are dying from plastic pollution

 

 

MARINE LIFE - This humpback whale is one example of a magnificent animal that is at the mercy of human activity. Humans are for the most part unaware of the harm their fast-lane lifestyles are causing. We aim to change that by doing all we can to promote ocean literacy.

 

 

 

 

 

 

COASTAL 10-14 METER COASTAL (RIVERVAX) PROTOTYPE - BALLPARK CONSTRUCTION ESTIMATES - CROWD, EU HORIZON, LOTTERY FUNDING